Commercial drone services
Drone Stockpile Measurement
Traditional measurement puts a worker on loose material with a prism pole. A drone flies an automated grid over the pile, captures overlapping images from elevated angles, and renders a 3D model the volumes come out of — more data points, in less time, without the climb.
From $650 / site · PDF volume report, orthomosaic, contours; 3D point cloud on request
Photogrammetry
Geometric properties determined from photographs: the same pile captured from many angles yields the point cloud the 3D model — and the volume — comes from.
Ground control points
Objects of known measurement placed in shot. Measured on site and checked against the model, they prove the baseline — and if the baseline holds, the rest of the measurements do too.
Interior barn measurement
Storage enclosures measured from the inside, safely, in almost any indoor environment — the same accurate data as an outdoor survey.

