Measuring on Frozen and Snow-Covered Ground in Alberta

What frozen and snow-covered Alberta ground does to a drone survey: why snow depth biases a surface upward in a way you cannot subtract out, why frost heave puts a seasonal component into elevations that is not material movement, and the conditions under which a winter dataset is genuinely comparable to a summer one.

Published 2026-11-19 · UAV Imaging Inc.

Key takeaways

A winter drone survey gets discussed as an operational question. Will the batteries hold up, is there enough daylight, can the crew work safely at that temperature. Those are real and the cold weather envelope and the short December daylight window are both worth planning around.

The question that costs more money is quieter: what does frozen and snow-covered ground do to the numbers that come out the other end. The honest answer is that it does two different things, they act in different directions, and only one of them is visible in the imagery.

Two problems that get confused for one

The first problem is that snow is on top of the ground. The surface a photogrammetric capture produces is the top of whatever reflected light back to the camera, so over snow it is the snow surface. Elevations are high and volumes above a base surface are large, by the local snow depth. This is a bias in a known direction.

The second problem is that the ground has moved. Frost penetrating frost-susceptible soil draws water to the freezing front, ice lenses form, and the ground above them lifts. The amount depends on soil texture, moisture availability and how deep the frost got, which means it varies across one site. This is not a bias in a known direction so much as a seasonal pattern laid over the real topography.

A site owner who reads a winter dataset as though only the first problem existed will subtract an average snow depth, feel they have dealt with it, and still be looking at elevations that contain a frost component.

Snow depth, and why an average does not rescue it

The temptation is obvious. Probe the snow in a few places, take the mean, drop the surface by that much. It does not work on an Alberta site for a straightforward reason: wind.

Across one working block the spread in snow depth is routinely larger than the vertical uncertainty the survey itself was specified to, which means the snow is the dominant error term rather than a correction to a small one. There is more detail on the texture and contrast side of this in the piece on surveying stockpiles and sites under snow, where fresh snow also starves photogrammetry of the detail it needs to match images at all.

On a pile specifically the geometry conspires against you. Snow thins on the crown where the wind works and thickens at the toe where it collects, so the snow envelope is not a uniform shell over the pile. It changes the pile's apparent shape, not just its apparent height, and a volume is a shape calculation.

Frost heave is a datum problem wearing a topography costume

Heave needs three things together: frost-susceptible soil, available water and frost penetration. Silts and silty clays with a water source are the classic combination, and Alberta has plenty of both. Clean granular material with good drainage heaves very little, which is one reason a properly built pad behaves better than the native ground beside it.

What this looks like in a dataset:

None of that is a survey error. The survey measured the ground correctly. The ground was in a different place.

Control on ground that is itself moving

This is where a winter capture quietly breaks a measurement series. A ground control target set on heaving native soil moves with that soil. If the control moved and the ground moved by a similar amount, the surface can look internally consistent while sitting at the wrong elevation relative to last summer. If the control moved by a different amount than the rest of the block, the error is distributed across the model in a way nobody can see afterwards.

The fix is not a winter technique, it is a decision made once at the start of a monitoring programme: permanent ground control monuments set below frost depth, a named horizontal and vertical frame, and a base coordinate that does not get re-derived every visit. Pins driven into frozen ground for a single flight are fine for that flight's internal geometry and worth nothing to the series. The coordinate system and datum have to be stated either way.

The practical version for checkpoints: put them on things that do not heave. Concrete, a pile cap, structural steel, the lid of a manhole, an established paved surface. Checkpoints on frozen native soil measure the soil's seasonal position, not the survey's accuracy.

Stockpiles with a frozen crust

Three winter-specific things happen to a pile measurement, and only one of them is about snow.

This is also a common and entirely avoidable source of the argument where two surveys of the same pile disagree. One was flown in November and one in May, both are correct, and nobody wrote down the conditions.

When a winter dataset is actually comparable

A winter capture is a perfectly good measurement of a site in winter. The question is what it can be compared against. In rough order of how much weight the comparison carries:

Which is the argument for scheduling rather than for technique. If a site is on an annual monitoring cadence, the baseline flight belongs on bare ground, after harvest or after the surface is clear and before the first lasting snow. That window is short in central and northern Alberta and it is the single cheapest decision available on the whole programme.

What has to be written down

If a winter capture happens, and plenty do because the material moved in winter and somebody has to measure it, the dataset is only as useful as its record. At minimum:

That record is what lets somebody in two years read the number correctly instead of treating a seasonal offset as a quantity. It is also the part that is free at the time of capture and impossible to reconstruct afterwards.

Frequently Asked Questions

Can you just subtract the snow depth from the surface?
Not reliably, because snow depth is not uniform. Wind strips exposed crowns and loads the lee side, traffic packs haul routes to a fraction of the untracked depth, and a pile toe collects drift. Across one working block the spread is usually larger than the vertical uncertainty the survey was specified to, so subtracting an average replaces a known bias with an unknown one. Probed depths at stated locations, reported alongside the surface, are more honest than a corrected surface that hides the assumption.
How much does frost heave actually move the ground?
It depends entirely on soil, water and frost depth, which is why we will not quote a number for a site we have not worked. The useful framing is that on frost-susceptible ground with a water source it is routinely large enough to matter against the tolerance a drone survey is being asked to resolve, and that it is unevenly distributed, so it shows up as a pattern rather than a constant. Well drained granular pads move far less than native silt.
Does this mean a winter survey is not worth doing?
No. A winter capture measures a site in winter accurately, and if material moved in January then January is when it has to be measured. The constraint is on the comparison, not on the capture. Two winter flights days apart give a clean difference. A winter flight compared against a summer baseline gives a difference with a seasonal component inside it that has to be stated.
What is the best time of year to set the baseline for a site we will fly every year?
Bare ground, after the surface is clear of crop or snow and before the first lasting snow, which in much of Alberta is a narrow autumn window. Spring after melt can work where the ground has dried and thawed, with the caution that it has to be genuinely thawed rather than still coming down from heave. Either way the point is to use the same window every year.
Does LiDAR solve the snow problem?
It helps with vegetation and it does not see through snow. A LiDAR pulse returns off the snow surface the same way light does, so the depth bias remains. Where LiDAR earns its cost in winter is on a site with standing vegetation or brush under the snow, and on sloped ground where photogrammetry is also struggling for texture.
Book a commercial drone flightMapping, inspection, multispectral and thermal across Alberta.Request a quote →or call 587-532-9000