UAV Imaging operates a focused fleet matched to industrial inspection, mapping and confined-space work across Alberta — led by the DJI Matrice 400 flying the five-sensor Zenmuse H30T. Every aircraft is Remote ID compliant for the November 2026 mandate and pilot-flown by Transport Canada Advanced RPAS holders carrying $5M aviation liability.
Aircraft
DJI Matrice 400
Flagship industrial platform. Up to 59-minute flight time, 6 kg payload capacity, RTK GNSS, integrated LiDAR + mmWave radar obstacle sensing for close-proximity and low-light flight, all-weather sealed. Carries the Zenmuse H30T five-sensor inspection gimbal, dedicated LiDAR mapping payloads, or the Pergam Falcon methane sensor. Full specs ›
DJI Matrice 300 RTK
Proven industrial platform. 55-minute flight time, IP45 weather sealing, RTK GNSS, -20°C cold rating, 15 m/s wind tolerance, dual-payload bay. Carries H20T (4K + 1200mm zoom + radiometric thermal + laser rangefinder), Pergam Falcon methane sensor, or L1 LiDAR. Full specs ›
DJI Mavic 3 Enterprise
Rapid-deploy aircraft for inspection and survey work in tight-access sites. 4/3 CMOS sensor, 56x hybrid zoom, optional RTK module, 45-minute flight time, 5.1K cinema video. Full specs ›
Flyability Elios 2
Collision-tolerant confined-space drone — the only platform in the fleet purpose-built to fly inside tanks, sewers, mine shafts, ore passes and pressure vessels. Carbon-fibre protective cage, 4K + thermal, no GPS dependency. Full specs ›
Sensors + payloads
DJI Zenmuse H30T
Flagship inspection payload on the Matrice 400. Five-sensor gimbal: 40 MP zoom (34x optical, 400x hybrid), 48 MP wide, 1280x1024 radiometric thermal (≤50 mK, 4x the H20T), laser rangefinder (3-3000 m), and an NIR auxiliary light for night and low-light work. Full specs ›
DJI Zenmuse H20T
Standard payload on the Matrice 300. Quad-sensor gimbal: 20 MP zoom (23-1200mm equivalent, 200x hybrid), 12 MP wide, radiometric thermal (640x512, ±2°C), laser rangefinder (3-1200 m, ±0.2 m). Full specs ›
Pergam Falcon Methane Detector
Laser-based methane detector. Tunable Diode Laser Absorption Spectroscopy (TDLAS). Path-integrated sensitivity in ppm-m. Flown on the Matrice 300 for natural gas distribution line, gathering system and pipeline leak detection. Full specs ›
Software stack
- Pix4Dmapper / Pix4Dmatic: primary photogrammetry processing
- DroneDeploy: field-ready orthomosaics and progress reports
- Agisoft Metashape: high-density point clouds for engineering deliverables
- DJI Pilot 2 / Terra: mission planning and on-aircraft computation
- RTKLib + Emlid Studio: PPK post-processing for remote-site work
- QGIS / ArcGIS: deliverable preparation, GIS layer compilation
- Flyability Inspector: Elios 2 post-flight reporting and defect mark-up
Compliance + certifications
- Transport Canada Advanced RPAS pilots on every flight
- $5M aviation liability insurance
- ISN, ComplyWorks, Avetta registered
- Remote ID compliant aircraft (mandatory Nov 2026)
- Active Level 1 Complex Operations BVLOS application

