Commercial Drone Services in Calgary, Alberta
UAV Imaging serves Calgary and southern Alberta with commercial drone services for construction, energy, aggregate, and solar projects. Crews mobilize from Edmonton or stage from a Calgary hotel for multi-day deployments, supporting downtown construction sites, southern Alberta wind and solar developments, and pre-mountain pit operations.
Services available in Calgary
- Drone stockpile measurement — aggregate, gravel, salt pile volume reports
- Drone mapping & pit plans — orthomosaics, 3D point clouds, regulator-ready CAD packages
- Drone construction services — weekly progress, as-builts, earthwork volumes
- Drone inspection services — flare stacks, transmission lines, roofs, towers
- Drone confined-space inspection — tanks, silos, sewers, mines (Flyability Elios 2)
- Solar farm thermal inspection — radiometric thermal, warranty-claim-grade reports
Industries served in the Calgary region
- Energy (oil and gas operations south of Calgary)
- Solar (utility-scale arrays in Vulcan, Brooks, Newell)
- Construction (Beltline, East Village, suburban builds)
- Wind energy (pre-construction site surveys)
- Aggregate (gravel pits along Highway 2 and Highway 22)
Service area
UAV Imaging crews regularly deploy across the following communities: Calgary, Airdrie, Chestermere, Cochrane, Okotoks, High River, Strathmore, Olds, Red Deer, Brooks, Vulcan. Projects outside the immediate region are quoted with mileage built in. Capital-region work is covered on our Edmonton drone services page.
Why hire an Alberta drone operator
Alberta-based crews mean faster mobilization, lower travel charges, and pilots familiar with regional airspace — including controlled airspace around Edmonton International, Calgary International, and Red Deer Regional. UAV Imaging pilots hold Transport Canada Advanced RPAS certifications and operate under standing NAV CANADA coordination agreements where required.
Compliance and credentials
- Transport Canada Advanced RPAS certified pilots (every crew member)
- $5M aviation liability insurance (well above the 2026 $2M minimum)
- ISN, ComplyWorks, Avetta registered
- Site-Specific Operations Risk Assessment (SORA) capable for higher-risk work
- 2026 Remote ID compliant fleet


