UAV Imaging operates across Alberta's industrial sectors with services tailored to the regulatory and operational realities of each. Pick a vertical below or contact us to scope a custom deliverable.
Industries served
- Construction — progress photography, as-built mapping, earthworks volumes, safety surveillance for GCs and civil contractors
- Oil & Gas — flare stack and structural inspection, pipeline patrol, aerial methane survey (Directive 060), tank and vessel inspection
- Aggregate & Mining — stockpile volume, pit plans, bench mapping, haul road design, ore-pass inspection
- Solar — every-module radiometric thermal inspection, severity-ranked anomaly reports, soiling assessment, IEC-aligned reporting
- Utilities & Transmission — line and tower inspection, substation thermal scan, right-of-way vegetation mapping, storm response
- Agriculture — multispectral NDVI crop scouting, management zone mapping, drainage and topographic survey, hail and flood damage documentation, bin and irrigation infrastructure inspection
- Insurance & Loss Adjusting — roof and hail damage capture, storm and flood extent mapping, fire and industrial loss scenes, dated geo-referenced imagery for the claim file
- Forestry & Vegetation Management — cutblock and road layout mapping, harvested-area as-built, regeneration imagery, right-of-way encroachment mapping, stress and post-disturbance documentation
- Land Development & Commercial Real Estate — pre-purchase site imagery and terrain, earthworks and cut/fill volumes, subdivision and servicing progress capture, leasing and listing aerials, roof and paving condition, dated as-built records
- Municipal — infrastructure asset mapping, landfill and lagoon volume surveys, road condition assessment, storm and flood response
Contact us for a vertical we have not yet published a dedicated page for — the service stack often already covers it.
Book a commercial drone flightMapping, inspection, multispectral and thermal across Alberta.Request a quote →or call 587-532-9000

