Close Visual Inspection of a Tower, Stack or Flare Without the Climb

What a drone close visual inspection of a tall vertical asset in Alberta actually delivers: full circumference imagery at a stated resolution, repeatable positions for a yearly program and live flare work without a shutdown, alongside the contact tests and internal surfaces it cannot reach.

Published 2026-11-26 · UAV Imaging Inc.

Key takeaways

Alberta industrial sites are full of assets that are tall, awkward and expensive to look at. Flare stacks and flare tips, process stacks and ducting, communications and meteorological towers, transmission structures, water towers, grain legs and head houses, elevator legs, silos and vent stacks. Each one has a condition that somebody is responsible for knowing, and each one sits far enough off the ground that knowing it has traditionally meant rope access, a man basket, scaffold, a crane or a shutdown.

A drone close visual inspection is a narrow and genuinely useful answer to that. It is also frequently oversold, so it is worth being precise about what it is.

What close visual inspection means, and what the drone changes

In an inspection program, close visual inspection is an examination of a surface conducted from a defined distance, with enough resolution to identify the defect types the program is looking for. It is a defined task with an acceptance criterion, and it is carried out by someone qualified to carry it out.

A drone does not change any of that. What it changes is how the camera gets within the defined distance. On a ninety metre stack, that is the whole problem. The aircraft is a positioning tool for a sensor, and the deliverable it produces is evidence for an inspector rather than a conclusion in its own right.

That framing matters commercially too. A quote that promises a condition assessment from a flight is promising something the flight does not produce, and a quote that promises an indexed image set at a stated ground sample distance is describing the thing that is actually for sale.

What you get back

The live flare case

This is the one that changes the economics rather than the convenience. A flare tip, the pilot and ignition assembly, the windshield and the upper shell are all things that degrade, and all things that are unreachable while the flare is lit. Inspecting them has conventionally meant waiting for a shutdown, and the shutdown interval is set by the plant rather than by the condition of the tip.

An aerial inspection of a running flare is a real capability, and it is a thermally driven operation rather than a visually driven one. The stand-off is set by radiant heat and by the plume, not by how close the lens needs to be, and the wind decides which side of the stack can be worked on a given day. It is planned around those constraints, and the result is an image set of the tip and the upper shell that lets the plant decide whether the next shutdown needs a tip change or not.

What it does not do is inspect the inside of the stack, measure remaining wall or test the refractory. Those remain shutdown work. The value is in knowing, before the shutdown is planned, what the shutdown has to include.

The hazards that shape the flight

On a vertical asset, the aviation side is usually the simple part. The site hazards are what drive the plan, and they are the same ones that make drone work inside an operating facility a coordination exercise rather than a booking.

Weather, which decides the schedule

A vertical job lives and dies on wind, and the relevant wind is the wind at working height. A calm morning at ground level can sit under twelve metres per second at the top of a stack, and the gradient is worse over flat open ground, which describes most of the province. The practical consequences are specific:

Making it a program rather than a photo shoot

A single inspection answers a single question. The thing that compounds is a series, and a series needs three boring commitments.

The first is fixed capture geometry. The same waypoints, the same stand-off, the same focal length and the same overlap, saved and reused. Two captures from different distances with different lenses are not comparable however good each one is on its own.

The second is a naming convention that matches the client's own asset register. Imagery filed under a flight date and a camera file number is unfindable in two years. Imagery filed under the asset tag, the elevation and the bearing is usable by whoever inherits the file.

The third is retention. The raw frames, the flight log and the plan, kept, so that next year's inspector can go back to the original rather than to a report about it.

Those three are what turn an aerial inspection into a condition trend, which is the only thing that justifies doing it annually instead of once.

What it cannot do

Inside those limits, the trade is a good one. The comparison worth making is not against doing nothing, it is against the cost of the access, which is laid out in the notes on drone inspection against scaffolding. On a tall asset, the access is usually the whole budget.

Frequently Asked Questions

Can you really inspect a flare while it is burning?
Yes, and it is one of the strongest cases for doing this from the air at all, because a lit flare is the one asset nobody can climb. The stand-off is set by radiant heat and by the plume rather than by the lens, so the workable sector is upwind and the wind on the day decides what gets covered. We agree an abort condition with the control room in advance in case the flare rate changes mid-flight. What comes back is the tip, the pilot assembly and the upper shell in detail, which is enough to decide whether the next shutdown needs a tip change.
Does this replace our rope access or scaffold inspection?
It replaces some of the trips and none of the contact work. If the task is to look at a surface and find the places that need attention, the flight does it faster, around the whole circumference, without an access structure. If the task includes thickness readings, coating tests, sounding or anything needing a hand on the asset, a person still has to get there. The sensible use is to let the imagery decide whether the access is justified this year and where it needs to be focused.
How close can the drone get, and how much detail does that give us?
Close enough that the limiting factor is usually the wind rather than the aircraft, and the honest way to answer it is with a number rather than an adjective. We state the ground sample distance at the surface for the plan we fly, because that is what determines whether the defect size your program cares about is detectable. If the program needs finer detail than the planned stand-off supports, that is a conversation before the flight rather than a disappointment after it.
Is there an interference risk with our tower's transmitters?
There are two risks and they are both real, which is why a live tower gets coordinated with its owner before a date is set. There is an exposure question for the crew working near radiating antennas, and there is an interference question for the aircraft's control and video links, which are themselves radio systems. On some structures the answer is that a sector gets powered down or detuned for the inspection window. We do not fly a live tower on an assumption.
What does the deliverable look like?
An image set organised by asset, elevation and bearing, named to match your asset register rather than our camera, with the capture geometry and ground sample distance recorded; a thermal set where the asset justifies one; and an anomaly list that says what was observed and exactly where to find it again. Deliberately not included is a severity rating or a fitness for service opinion, because those belong to the inspector or engineer who owns the program.
Why does a vertical inspection get rescheduled more than a mapping flight?
Because the wind that matters is at the top of the asset, not at the truck. A calm morning on the ground can be unworkable ninety metres up, and close stand-off work has no margin for gusts, particularly on the downwind side of a large structure where the air is turbulent. We book vertical work with a weather day behind it as a matter of course. A capture that has to happen on one fixed date is a capture flown in conditions somebody will regret.
Can you inspect the inside of a stack or a silo at the same time?
Not on the same flight or with the same aircraft. Internal work has no satellite positioning, needs its own lighting and is flown with a collision-tolerant aircraft built for contact, and it almost always needs the asset down and purged. It is a separate operation with its own permits. It is frequently worth pairing with an external inspection during a shutdown, and it is planned as two jobs rather than one.