GSD (Ground Sample Distance)

Ground Sample Distance is the real-world size of one pixel in a drone image. Definition, the formula, what it controls in a survey, and why it is not the same thing as accuracy.

Published 2026-09-02 · UAV Imaging Inc.

GSD (Ground Sample Distance) is the real-world distance covered by a single pixel in an aerial image, normally quoted in centimetres per pixel. A survey flown at 2 cm GSD means each pixel in the imagery represents a 2 cm square on the ground.

Formula

GSD = (sensor pixel pitch × flight height above ground) / focal length

In practice the two things an operator can change on the day are the aircraft (its sensor and lens) and the flight height. Everything else is fixed. Lower flight height gives finer GSD, more images, more flight time and more processing.

What GSD controls

GSD is not accuracy

This is the most common misreading. GSD describes image resolution — how much detail is in the picture. Accuracy describes how close the model's coordinates are to reality, and that comes from GNSS positioning, RTK or PPK, ground control and the coordinate system and datum in use.

A survey can have very fine GSD and poor positional accuracy, or coarse GSD and excellent accuracy. A quote that offers a GSD figure in place of an accuracy statement has answered a different question than the one that was asked.

Choosing a GSD

Work backwards from the smallest thing the deliverable has to resolve, rather than asking for the finest number available. Volumetric surveys and site orthomosaics generally do not need the GSD that a close-range structural inspection does, and buying resolution nobody uses costs field time on every future flight.

Related

Book a commercial drone flightMapping, inspection, multispectral and thermal across Alberta.Request a quote →or call 587-532-9000