Long-form reference guides for people specifying, buying or signing off on commercial drone work in Alberta. Each one is written to be read once end to end and then used as a checklist.
Shorter pieces live on the blog, side-by-side method comparisons in comparisons, and single-term definitions in the glossary.
Free downloads
Shorter than a guide and built to be printed or handed to a bidder: a 2026 Alberta RPAS compliance checklist, a sample stockpile volume report showing what the deliverable actually looks like, and a solar farm inspection report template. All three are on the free resources page.

