Commercial drone services for Stony Plain, Spruce Grove and Parkland County: land development and subdivision progress, Acheson and Highway 16 industrial site survey, stockpile volumes, power and transmission inspection, agriculture and municipal mapping. Transport Canada certified, $5M insured, within day-trip range of our Alberta base.

Published 2026-09-16 · UAV Imaging Inc.

UAV Imaging covers Stony Plain, Spruce Grove and Parkland County as routine day-trip work rather than a planned mobilisation. The Highway 16 corridor west of Edmonton is roughly half an hour from our base, which changes what is practical here: short-notice capture, repeat monthly progress flights and single-asset inspections are all schedulable without a travel line that makes them uneconomic.

The work in this corridor is shaped by four things happening on the same ground. Land development and subdivision build-out across both cities and the county. A dense industrial and logistics block along Highway 16 and through Acheson. Power generation and transmission infrastructure in the Wabamun and Genesee area. And working agriculture and aggregate operations across the rest of Parkland County.

Services available in Stony Plain and Spruce Grove

Industries served around Parkland County

Service area

UAV Imaging works the City of Spruce Grove, the Town of Stony Plain and all of Parkland County, including Acheson, Carvel, Duffield, Entwistle, Fallis, Gainford, Genesee, Keephills, Seba Beach, Tomahawk and Wabamun, along with the Highway 16, 16A, 60, 627 and 770 corridors. Work here is routinely combined with Edmonton, St. Albert, Devon and Leduc jobs in the same day, and county sites are batched into a single trip so that scattered parcels do not each carry their own setup.

Airspace here needs checking, and it is not the one people expect

The airspace item in this corridor is Villeneuve Airport, immediately northeast of Spruce Grove. It is a busy general aviation and flight training field with its own control zone, and training circuits put light aircraft over ground well beyond the runway. Sites in the north and east of Spruce Grove and across the adjacent county can fall inside airspace that requires authorisation before a flight, and that authorisation takes time to arrange.

Edmonton International sits to the southeast and matters for work toward Devon and Leduc. There are also registered private and agricultural strips scattered through Parkland County that do not appear on a casual look. None of this stops ordinary work. All of it is settled by checking exact site coordinates at quoting rather than the town name on the morning of the flight, which is the difference between a scheduling note and a wasted mobilisation.

Why hire an operator who works this corridor

Development work has a requirement most industrial capture does not: the flights have to be comparable. A progress set is only worth keeping if each month was flown at a similar altitude, on a similar path, into the same coordinate system, so that two dates can be laid on top of each other and the difference means something. That is a discipline rather than a piece of equipment, and it is the thing that turns a folder of pictures into a record a lender, an owner or a lawyer can rely on.

Being half an hour away is the other half of it. A site that needs capture before a pour, after a storm or ahead of a draw request needs an operator who can be there this week, not one pricing a trip. UAV Imaging pairs that with Transport Canada certified crews, $5M aviation liability insurance, and deliverables built to be measured against rather than just looked at.

Compliance and credentials

Frequently Asked Questions

Do you fly construction and subdivision progress work in Spruce Grove and Stony Plain?
Yes, and it is the most common request in this corridor. A progress program is flown on a repeating schedule at a consistent altitude and flight path into a fixed coordinate system, so that any two dates can be overlaid and the difference between them is real rather than an artefact of how each flight was set up. Each visit produces a dated orthomosaic, oblique imagery of the whole site and earthworks volumes where they are needed. That set is what supports draw requests, owner reporting and any later question about what the site looked like on a given day.
Does Villeneuve Airport stop drone work around Spruce Grove?
No, but it has to be checked before a crew is scheduled rather than on the morning. Villeneuve is a busy general aviation and training field just northeast of the city with its own control zone, and training circuits carry light aircraft over ground well past the runway. Sites in north and east Spruce Grove and the adjacent county can sit in airspace that requires authorisation, and that takes time to arrange. Send the exact site location with your enquiry and the question is answered at quoting, which is the cheap time to find a constraint.
Do you charge travel to Parkland County from Edmonton?
This corridor is day-trip distance, roughly half an hour from our base, so it is quoted as routine work rather than as a planned mobilisation with a travel line attached. Work here is regularly combined with Edmonton, St. Albert, Devon and Leduc jobs on the same day, and multiple county parcels are batched into one trip so scattered sites do not each carry their own setup cost.
Can you inspect transmission lines, substations and generation assets near Wabamun and Genesee?
Yes. Structure and conductor imagery, right-of-way and vegetation capture, and radiometric thermal survey of electrical assets under load are all standard aerial work, and they are far faster and safer than the ground or climbing equivalent. Findings are delivered as mapped, prioritised positions rather than a folder of images. Work on utility-owned or operator-managed assets is arranged through the asset owner's own permitting and safety process, and we are ISN, ComplyWorks and Avetta registered for exactly that.
Can you measure gravel and material stockpiles at county pits?
Yes. A flight produces a surface of the actual pile, including the slumps and irregularities a ground crew would never shoot individually, and the volume is computed against a defined base surface rather than an assumed flat one. The deliverable includes the base surface used and an accuracy report against independent check points, which is what makes the number defensible for inventory reconciliation or an audit rather than an estimate off a photograph.
Do you do roof inspections on industrial buildings in Acheson?
Yes, and it is a good use of aerial capture. A visual survey documents the physical condition of the membrane, seams, flashings, penetrations and rooftop equipment across an entire roof without anyone going up, and a radiometric thermal scan flown in the right conditions indicates moisture trapped in the assembly beneath it. Thermal anomalies are reported for verification on the roof before a repair scope is written, because the imagery finds candidates and a ground check confirms them.