Free planning tools from UAV Imaging. Each gives you a quick, rough figure to plan against — then UAV Imaging delivers the survey-grade, measured number when you need something you can book, bill or report against.
Available tools
- Drone Survey Scope Builder - five questions turned into a written scope you can paste into an RFP or a purchase order
- Alberta Coordinate System Picker — the coordinate reference and vertical datum to write into your scope, from location, existing data and purpose
- Pipeline Patrol Cost Calculator — ground vs drone annual patrol cost from your own per-km rates
- Drone Contractor Compliance Self-Check — score a contractor's bid package against the certificates, insurance and data terms you should hold
- Stockpile Volume Estimator — rough cubic-metre and tonnage estimate from pile dimensions (cone, pyramid, windrow)
- Solar Inspection ROI Calculator — compare aerial thermal inspection against a ground-crew baseline across your array to estimate annual savings
These are planning aids, not measurement instruments. For an engineering-grade deliverable with a documented accuracy report, request a drone survey.
Book a commercial drone flightMapping, inspection, multispectral and thermal across Alberta.Request a quote →or call 587-532-9000

