UAV Imaging serves Wetaskiwin and Wetaskiwin County with a drone-services menu built for what the area actually runs on: mixed grain, canola and forage farming across the county, the light industrial and commercial ground along the Highway 2A corridor, municipal infrastructure inside the city, and the acreage and lake development around Pigeon Lake. Wetaskiwin sits within easy single-day mobilisation range of our Alberta base, and travel is quoted up front.
The city has its own registered aerodrome, and there are private and agricultural strips scattered through the county, so airspace is checked against the exact field or facility coordinates before a crew is scheduled rather than on the morning of the flight.
Services available in Wetaskiwin
- Multispectral NDVI crop scouting — calibrated vegetation-index mapping for grain, canola and forage across county fields, flown to a growth stage rather than a calendar date
- Drone mapping & site plans — field drainage and topographic survey, orthomosaics, lease and yard as-builts
- Drone stockpile measurement — aggregate, gravel, sand and feed pile volumes against a defined base surface
- Drone inspection services — grain bin roofs and aeration, shop and commercial roofs, water and wastewater structures, communication and lighting structures
- Damage documentation — dated, geo-referenced hail, wind and flood imagery for insurance and agronomy files
- Construction progress imagery — dated site records, earthworks volumes and as-built capture on subdivision and commercial builds
- Marketing and land aerial imagery — high-resolution stills and video of acreages, lake developments, dealerships and commercial property
Industries served around Wetaskiwin
- Agriculture — multispectral scouting, management zone mapping, drainage and levelling survey, hail and flood documentation
- Municipal government — infrastructure asset mapping, lagoon and stockpile volumes, road condition, storm response
- Construction and land development — progress photography, earthworks volumes, subdivision as-built
- Aggregate — pit plans and stockpile volume on county gravel operations
- Commercial and light industrial — roof, yard and structure inspection along the Highway 2A corridor
- Insurance and loss adjusting — roof, hail and storm documentation across the region
Service area
UAV Imaging works the City of Wetaskiwin plus Millet, Falun, Westerose, Ma-Me-O Beach and the Pigeon Lake communities, Gwynne, Bittern Lake, Winfield, Alder Flats, Buck Lake and the surrounding County of Wetaskiwin. Camrose, Leduc and Ponoka work is routinely combined into the same trip, and multi-parcel agricultural jobs are scheduled together so travel is charged once rather than per field.
Why hire a drone operator who knows the region
Central Alberta agricultural work has a scheduling problem that industrial work does not: an index map is only useful if it is flown at the growth stage the decision depends on, and the window can be days. An operator who understands that books against a stage with a flexibility window, settles the airspace question at quoting, and combines neighbouring parcels into one mobilisation. UAV Imaging pairs that with Transport Canada certified crews, $5M aviation liability insurance, and deliverables built to be measured against — not just looked at.
Compliance and credentials
- Transport Canada certified RPAS pilots on every flight
- $5M aviation liability insurance
- ISN, ComplyWorks and Avetta registered for contractor-managed sites
- Airspace checks and any required authorisation handled before mobilisation
- Documented data handling and retention practice

