UAV Imaging serves Medicine Hat and the southeast Alberta corridor with an industrial drone-services menu built for the region's mix of gas production, aggregate operations, irrigation-belt agriculture and the growing utility-scale solar build-out across Cypress and Forty Mile counties. Crews stage from Medicine Hat for multi-day deployments and quote travel up front.
Services available in Medicine Hat
- Solar farm drone inspections — every-module radiometric thermal scan, severity-ranked anomaly reports across southern Alberta arrays
- Drone stockpile measurement — aggregate, gravel and salt pile volume reports
- Drone inspection services — gas plant structures, flare and vent stacks, gathering lines, transmission towers
- Drone mapping & pit plans — pit progression, bench geometry, haul road as-built
- Drone construction services — solar and civil project progress, as-built, earthwork volume
- Aerial methane survey — gathering systems and well pads (Pergam Falcon on Matrice 300 RTK)
Industries served around Medicine Hat
- Natural gas production — shallow gas fields, gathering systems, plant and facility inspection
- Utility-scale solar — thermal inspection and commissioning surveys across the Cypress / Forty Mile solar corridor
- Aggregate — pit volume, bench mapping, haul road design along the South Saskatchewan River corridor
- Irrigation agriculture — multispectral crop scouting across the St. Mary and Eastern irrigation districts
- Heavy civil — road, pad and renewable-energy project construction progress
Service area
UAV Imaging works Medicine Hat proper plus Redcliff, Dunmore, Bow Island, Brooks, Seven Persons, Foremost, Cypress County and the Forty Mile County solar belt. Larger southern Alberta solar and aggregate scopes stage out of Medicine Hat hotels on multi-day deployments.
Why hire a drone operator familiar with southeast Alberta work
The region pairs sun-rich solar economics with mature gas infrastructure and active aggregate pits — three deliverable types that each carry their own compliance and reporting expectations. UAV Imaging arrives with the certifications, the SORA experience and the payloads (Matrice 300 RTK + H20T thermal + Pergam Falcon + Elios 2) that match the work southeast Alberta operators actually buy.
Compliance and credentials
- Transport Canada Advanced RPAS certified pilots on every flight
- $5M aviation liability insurance (above the 2026 $2M minimum)
- ISN, ComplyWorks, Avetta registered
- Site-Specific Operations Risk Assessment (SORA) on higher-risk operations
- 2026 Remote ID compliant fleet

