UAV Imaging covers Fort McMurray, Wood Buffalo and the surrounding oilsands corridor with a focused industrial drone-services menu. The region's mix of mining operations, in-situ SAGD pads, processing facilities, gathering systems and tank farms maps directly onto the inspection, mapping and methane survey work UAV Imaging runs every day.
Services available in Fort McMurray
- Drone confined-space inspection — crude storage tanks, separators, pressure vessels, flare stack interiors
- Drone inspection services — flare stacks, vent stacks, structural steel, gathering lines, transmission towers
- Drone mapping & pit plans — mine pit progression, bench geometry, haul road as-built, overburden volume
- Drone stockpile measurement — ore, overburden and aggregate volume reports
- Drone construction services — SAGD pad construction, plant turnaround documentation, capital project progress
- Aerial methane survey — gathering systems, well pads, tank farms (Pergam Falcon on Matrice 300 RTK)
Industries served around Fort McMurray
- Oilsands mining — pit progression, bench mapping, ore-pass inspection, reclamation documentation
- In-situ SAGD operations — pad construction, steam generator inspection, well-pair monitoring
- Upgrader and processing — vessel, stack, flare and tank inspection
- Pipeline and gathering — aerial patrol, methane survey, ROW vegetation tracking
- Heavy civil — reclamation, tailings dam, road and pad construction progress
Service area
UAV Imaging dispatches from Edmonton to Fort McMurray on demand and stages multi-day deployments out of regional hotels for larger scopes. Crews regularly work Fort McMurray proper, the Wood Buffalo airport corridor, Mildred Lake, Aurora, Horizon, Albian, Fort Hills, Kearl, Surmont, MacKay River, Christina Lake and the surrounding SAGD operating areas.
Why hire a drone operator familiar with oilsands work
Oilsands sites carry contractor-management requirements (ISN, ComplyWorks, Avetta), turnaround scheduling pressure, and atmospheric realities (cold-weather windows, smoke season visibility, controlled airspace around the Mildred Lake airstrip and Wood Buffalo International) that a general aerial photographer cannot navigate. UAV Imaging arrives with the certifications, the SORA experience, and the airframes (Matrice 300 RTK + Elios 2 + H20T + Pergam Falcon) that match the deliverables operators here actually buy.
Compliance and credentials
- Transport Canada Advanced RPAS certified pilots on every flight
- $5M aviation liability insurance (above 2026 $2M minimum)
- ISN, ComplyWorks, Avetta registered — standard for oilsands site access
- Site-Specific Operations Risk Assessment (SORA) on higher-risk operations
- 2026 Remote ID compliant fleet
- Cold-weather operations to -25°C (Matrice 300 RTK envelope)

